gtag('config', 'AW-16763923551');
0086-523-86188882
E-mail: jhfsale@jhgenerator.com
Language
English
Русско
Spanish
Arabic
中文
TEL: 0086-523-86188882
Home
Products
Generator Set (Engine Brand)
Silent Generator
Generator Set(Fuel)
Special Generator
Control System
Accessories & Parts
About us
Company Profile
Certification
History
Cilent Visit
Jianghao Overseas
Case
Service
Maintenance
FAQ
Service Center
First Rate Service
Spare Parts
Questionnaire
News
Jianghao News
Industry News
Contact
Diesel generator room design
When the room is located within the high-rise buildings, the daily tank should be set up rooms, separated by a firewall and diesel generators.
2022
11-24
Generator set exercise
Generator sets on continuous standby must be able to go from a cold start to being fully operational in a matter of seconds. This can impose a severe burden on engine parts.
General inspection
When the generator set is running, operators need to be alert for mechanical problems that could create unsafe or hazardous conditions. Following are several areas that should be inspected frequently to maintain safe and reliable operation.
Fuel system service
Diesel fuel is subject to contamination and deterioration over time, and one reason for egular generator set exercise is to use up stored fuel over the course of a year before it degrades.
Cleaning batteries:
Be careful to prevent the solution from entering the battery cells, and flush the batteries with clean water when done. After replacing the connections, coat the terminals with a light application of petroleum jelly.
Checking electrolyte level:
Check the level of the electrolyte in the batteries at least every 200 hours of operation. If low, fill the battery cells to the bottom of the filler neck with distilled water.